Intermediate Distribution Frame of Transmission Equipment
Photograph of workers at work at the Lagos Central Telegraph Office (Date: 19th May, 1960)
Colonial Phone Booth At Calabar Museum
Nigeria National Telex / Gentex Network
Alcatel Transmission Equipment
The Engineer explaining a point shortly after the commissioning of the call office
The Engineer explaining a point shortly after the commissioning of the call office and the automatic exchange at Otan Ayegbaju and Ilesa by Hon. Akinfosile (Date: 11th January, 1963)
Technicians at P and T Training School Oshodi at work. (Date: 20th August, 1956)
EWSD Switching Equipment
Photograph of Teleprinter at P and T Training School Oshodi (Date: 29th October, 1959)
Visit of the Members of Advisory Council to Post and Telegraph Department, Lagos (Date: 29th April, 1959)
Siemens PDH Transmission Equipment
Digital Main Distribution Frame
EWSD Switching Equipment (Second Photo)
The Prime Minister, Sir Tafawa Balewa at his residence
The Prime Minister, Sir Tafawa Balewa at his residence, making inaugural call during the official commissioning of telephone link between Nigeria and Togo (Date: 4th September, 1962)
Typical 17KVA Generator Set for a Repeater Station
P and T Telephone Operator at work (Date: 4/2/1958)
Oki Transmission Equipment
The old telecommunication wires used to provide telephony services to Nigerian users
The old telecommunication wires used to provide telephony services to Nigerian users in the 1980's and 1990's. These wires have now been replaced with wireless connections to base stations, nationwide.
Sir. James Robertson (Left) and Dr. K. O. Mbadiwe shortly after the official commissioning of an exchange (Date: 20/4/1956)
20th August, 1956
Technician at work at P and T Technical Training School Oshodi